GM035E
Session: Sep 1999 (session 3)
Wavelength: 6 cm
Comment
To give feedback on this experiment, click
here
Experiment Feedback
Effelsberg (A. Kraus at Thu Sep 23 08:33:48 METDST 1999) Minor failures
Due to a 1day-jump of the day counter (which was not noticed directly)
the scans between UT0930 - UT1249 were lost.
Noto (C.Trigilio at Thu Sep 23 17:24:31 METDST 1999) Minor failures
The capstain motor sent by the Max Planck correlator was installed. The observations started at 16:28 of Sep 22th.
Jodrell (Alastair Gunn at Wed Sep 29 13:28:36 METDST 1999) Success
No known problems.
Calibration (Jean\-Francois Desmurs at Sun Nov 7 15:48:22 MET 1999) Success
The ANTAB formatted file for this experiment can be found on VLBEER
in the sep99 directory under the name:
gm035e.antab.
Read the comments in the file to get further information.