GL021B
Session:
Sep 1997 (session 3)
Frequency:
6 cm
Comment
To give feedback on this experiment, click
here
Experiment Feedback
Medicina (T. Venturi at Fri Sep 19 23:28:19 METDST 1997) Minor failures
First 45 minutes lost because of problems at the antenna.
Otherwise the experiment ran smoothly without apparent
problems.
Torun (K.Borkowski at Sat Sep 20 23:09:41 METDST 1997) Success
Effelsberg (dgraham at Mon Sep 22 09:11:22 METDST 1997) Minor failures
PI underestimated acceleration time. 6 degree drive to reference source
took up to 50 sec, so only 10-15 sec on source. Better at low elevation.
Noto (C.Trigilio at Mon Sep 22 16:51:53 METDST 1997) Success
Westerbork (Tony Foley at Tue Sep 23 17:21:36 METDST 1997) Minor failures
Read headstack sometimes stuck and
telescope not yet onsource at start of
observation (slews were too fast)
Cambridge (Alastair Gunn at Tue Sep 23 22:00:51 METDST 1997) Success
No known problems. Possible erroneous SLEWING error
messages and tape motion error messages.
Calibration (Fredrik T Rantakyro at Wed Nov 5 15:46:52 MET 1997) Minor failures
The ANTAB formatted TSYS information can be found on VLBEER in the
SEP97 directory. The file is called gl021b.antab and contains the
latest antenna calibration information.