GL021A
Session:
Sep 1997 (session 3)
Frequency:
18 cm
Comment
To give feedback on this experiment, click
here
Experiment Feedback
Medicina (Marco Morsiani at Mon Sep 15 23:44:16 METDST 1997) Success
Westerbork (Tony Foley at Tue Sep 16 12:20:34 METDST 1997) Minor failures
No known problems.
I turned the phasecal off during this
experiment as its LO was saturating one BBC
(it comes out at 138.5MHz in the VLBI IF).
Effelsberg (dgraham at Tue Sep 16 14:30:13 METDST 1997) Success
Torun (K. Borkowski at Tue Sep 16 21:52:22 METDST 1997) Minor failures
About 30 minutes lost due to the power failure at 14:13.
Jodrell (Alastair Gunn at Wed Sep 17 11:05:59 METDST 1997) Minor failures
Terminal configuration changed from vlbag to VLBA at about
13:09 UT after FS restart. Data before this time lost.
No other known problems.
Noto (C.Trigilio at Mon Sep 22 16:42:34 METDST 1997) Success
Calibration (Fredrik T Rantakyro at Wed Nov 5 15:46:36 MET 1997) Minor failures
The ANTAB formatted TSYS information can be found on VLBEER in the
SEP97 directory. The file is called gl021a.antab and contains the
latest antenna calibration information.