ES046
Session: Nov 2002 (session 3)
Wavelength: 6 cm
Comment
To give feedback on this experiment, click
here
Experiment Feedback
Shanghai (Huang Xinyong at Sat Nov 9 23:28:26 2002) Success :
Urumqi (yangwenjun at Sun Nov 10 00:05:01 2002) Success :
Onsala (Michael Lindqvist at Sun Nov 10 07:26:07 2002) Success :
No known problems.
Effelsberg (A. Kraus at Mon Nov 11 11:14:06 2002) Minor failures :
During the experiment, the operator informed me about differences between the printed schedule and the real observations. Checking vlbeer, I noted that the PI updated only the .key, .skd, and the .sch.xx files, but not the es046crd.eb which controls our VLBA-type fieldsystem. Using the new .key-file, I ran sched, and installed the correct schedule at UT1652.
Jodrell_Bank (Alastair Gunn at Mon Nov 11 11:34:47 2002) Success :
No known problems.
Torun (K.Borkowski at Tue Nov 12 11:18:56 2002) Minor failures :
We lost two scans (at 14:46 and 15:43) because of too long slewing and lost all observations after 22:40 (till midnight) because of
antenna control problems (old sensors in azimuth sometimes generate false signals causing a havoc).
Medicina (A.Maccaferri at Fri Nov 15 07:26:39 2002) Success :
Westerbork (Tony Foley at Thu Dec 12 11:08:46 2002) Minor failures : PHAS
IF stuck 15:38 to 16:05 UT
Westerbork (Tony Foley at Thu Dec 12 11:09:15 2002) Minor failures : HA-E PHAS
Many scans out of HA range
Westerbork (Tony Foley at Thu Dec 12 11:12:16 2002) Minor failures : PHAS
IF for telescope D stuck 22:38 to 22:46UT
Westerbork (Tony Foley at Thu Dec 12 11:12:18 2002) Minor failures : PHAS
IF for telescope D stuck 22:38 to 22:46UT