CL02C1
Session: Nov 2002 (session 3)
Wavelength: 6 cm
Comment
To give feedback on this experiment, click
here
Experiment Feedback
Shanghai (Huang Xinyong at Fri Nov 8 14:00:49 2002) Success :
We circulated the ONOFF with 3C405 and 3c123. The results include in same one log file.
Urumqi (yangwenjun at Fri Nov 8 18:22:23 2002) Success :
The details are in logfile.
Medicina (Orfei at Fri Nov 8 23:10:35 2002) Success :
The obs was extended until 19UT
Torun (K.Borkowski at Sun Nov 10 14:41:27 2002) Success :
No known problems.
Jodrell_Bank (Alastair Gunn at Mon Nov 11 11:32:41 2002) Minor failures :
Did not use new ONOFF program due to conflicting logic with our local control software. Instead took calibration data manually.
Cambridge (ALastair Gunn at Mon Nov 11 11:33:25 2002) Failure :
No TSYS information available through the MERLIN microwave link.
Effelsberg (A. Kraus at Tue Nov 12 10:12:33 2002) Minor failures :
We used 3C286 and 3C295. The results using onoff are a bit doubtful. We check for possible errors. As ususal, additional calibration checks (using telescope-specific procedures) were performed.
Onsala (John Conway at Tue Dec 3 17:59:21 2002) Success :
Experiment was made but logs were placed very late
on vlbeer (3rd December).
Hartebeesthoek (Jonathan Quick at Wed Dec 11 12:01:32 2002) Minor failures : FS
We observed Cygnus-A throughout but got bit by the sygnus-a/cygnusa bug so the data had to be corrected manually after the fact. Log
deposited on vlbeer has been corrected.