GY001
Session: May 1998 (session 2)
Wavelength: 18 cm
Comment
To give feedback on this experiment, click
here
Experiment Feedback
Torun (K. Borkowski at Sat Jun 6 14:13:00 METDST 1998) Failure
Torun did not observe due to problems with the
tape recorder (see note with the previous experiment).
Medicina (Morsiani at Sat Jun 6 18:00:46 METDST 1998) Success
all scan recorded
Onsala (John Conway at Sun Jun 7 17:57:59 METDST 1998) Success
No known problems
Westerbork (Tony Foley at Mon Jun 8 09:59:34 METDST 1998) Minor failures
First 3C84 scan lost (schedule started with
too little time to get to slew to first source).
All scans of UOri before ~07:00UT were out of
HA range for us (noted in sch output but still
scheduled anyway!).
Westerbork (Tony Foley at Mon Jun 8 10:08:08 METDST 1998) Minor failures
Please note 2 occurences which did not appear
to affect the VLBI. The airconditioning fell out
for ~1hour at about 14UT. There was also a large
thunderstorm about 17:00-21:00 UT.
Noto (C.Trigilio at Mon Jun 8 18:06:33 METDST 1998) Success
Jodrell (Alastair Gunn at Tue Jun 9 03:06:34 METDST 1998) Minor failures
Serious problems with antenna control, tape loading and
TTY distributor at start of schedule. Probably lost data
for first hour or more. VCs 1 to 4 okay by this time but
other VC alarms took longer to clear. Strong RFI in VCs
5 and 6.
Calibration (Jean\-Francois Desmurs at Wed Jun 10 16:01:50 METDST 1998) Minor failures
The ANTAB formatted file for this experiment can be found on VLBEER
in the may98 directory under the name
gy001.antab. Rem: Jb strange value after ~157-10:12.
Mc No Tsys.
Read the comments in the file to get further information.
Effelsberg (dgraham at Fri Jun 12 14:56:29 METDST 1998) Minor failures
Rain. This experiment should have been scheduled for VLBA terminal, not MK4.
Weights on high-numbered tracks poor.
Torun ( at Tue Jul 21 19:45:45 METDST 1998) Minor failures