18 cm Session

Session: May 1997 (session 2)
Frequency: 18 cm
Dates: 27/5 - 4/6

Comment


To give feedback on this session, click here

18 cm Session Feedback

Westerbork (tony foley at Thu May 29 11:14:55 METDST 1997) Minor failures
The prototype MFFE had some problems when installed on the planned telescope, as the helium cooling system had not been properly flushed. Hence we had to use an old 18cm series frontend with Tsys of ~600-700Jy and produce the circular polarization using a hybrid in the IF system.

Jodrell (Alastair Gunn at Tue Jun 3 11:27:30 METDST 1997) Minor failures
As usual we have had severe RFI at 18cm saturating our receiver.