18 cm Session
Session: May 1997 (session 2)
Frequency: 18 cm
Dates: 27/5 - 4/6
Comment
To give feedback on this session, click
here
18 cm Session Feedback
Westerbork (tony foley at Thu May 29 11:14:55 METDST 1997) Minor failures
The prototype MFFE had some problems when
installed on the planned telescope, as the
helium cooling system had not been properly flushed.
Hence we had to use an old 18cm series frontend
with Tsys of ~600-700Jy and produce the circular
polarization using a hybrid in the IF system.
Jodrell (Alastair Gunn at Tue Jun 3 11:27:30 METDST 1997) Minor failures
As usual we have had severe RFI at 18cm saturating our
receiver.