EC014

Session: May 2000 (session 2)
Wavelength: 6 cm

Comment


To give feedback on this experiment, click here

Experiment Feedback

\(Other\) (D. Dallacasa at Mon Jun 5 04:11:10 METDST 2000) Success
No apparent problem during observation

Medicina (D. Dallacasa at Mon Jun 5 04:11:30 METDST 2000) Success
No apparent problem during observation

Onsala (A. Polatidis at Mon Jun 5 11:04:00 METDST 2000) Success

Jodrell_Bank (Alastair Gunn at Mon Jun 5 12:28:31 METDST 2000) Minor failures
FS crashed and restarted at 18:14 UT. No other known problems.

Torun (K.Borkowski at Mon Jun 5 19:26:59 METDST 2000) Minor failures
There were problems with Tsys calibration since 9:16 UT.

Shanghai (Huang Xinyong at Tue Jun 6 02:28:19 METDST 2000) Minor failures
Following scans were lost UT:14:35:45 - 14:55:45 14:05:00 - 16:02:48.

Effelsberg (A. Kraus at Tue Jun 6 11:15:00 METDST 2000) Minor failures
Problems with the VLBA-FS-Computer led to the loss of data untill UT1500. Later, one scan (UT2025-2030) had to be skipped (azimuth limit).

Noto (C.Trigilio at Tue Jun 6 12:47:40 METDST 2000) Minor failures
From 23:29 to 23:55 UT antenna not tracking for cable wrap problems.

Noto (C.Trigilio at Tue Jun 6 12:49:05 METDST 2000) Minor failures
From 23:29 to 23:55 UT antenna not tracking for cable wrap problems.

Westerbork (Tony Foley at Wed Jun 7 13:40:45 METDST 2000) Minor failures
Tied array with all telescopes EXCEPT RT8 out from 16:28 to 19:15 (Helium leak being refilled) and RT6 out from 18:20 to 18:40 and 18:45 to the end (pointing control problems)

Urumqi (Liu X. at Thu Jun 8 06:35:48 METDST 2000) Failure
Ur is not included in the ec014 schedule.