EC044

Session: Jun 2014 (session 2)
Wavelength: 5 cm

Comment


To give feedback on this experiment, click here

Experiment Feedback

Yebes (Daniel Valero at Tue Jun 17 06:49:19 2014) Minor failures: TSYS
First 20 scan without tsys: Problem to the frequency 5280

Torun (K. Borkowski at Tue Jun 17 06:51:33 2014) Minor failures: HIGH ANT
First scan observed with very high Tsys (the reason seems to have something to do with change of HF filters, but is somewhat misterious and will be further investigated). Since 1:44 UTC for about one hour the FS lost telescope control which in this case means that during this period the telescope tracked continuously only one source (K3-35).

Noto (P. Cassaro at Tue Jun 17 07:49:23 2014) Failure:RECE
The LO was wrongly set up for all the experiment.

Westerbork (Geert Kuper at Tue Jun 17 09:03:09 2014) Success:

Shanghai (Bo Xia at Wed Jun 18 01:25:44 2014) Success:

Shanghai (Bo Xia at Wed Jun 18 01:26:19 2014) Success:

Jodrell_Bank (Jimmy Cullen at Thu Jun 19 15:08:23 2014) Minor failures: FS
Control computer failed causing loss of data 20:40 - 21:14 UT and 03:30 - 03:55 UT

Onsala (Jun Yang at Mon Jun 23 09:40:32 2014) Minor failures: ANT
The fuse associated with the Declination motor was blew again at night. The exact time was at ~0:40 UT. After that, the antenna could only track the calibrator J1925+2106. The observations stopped at 3:40 UT when the operator noticed the problem.

Effelsberg (Uwe Bach at Mon Jun 23 13:56:42 2014) Success: