RO004D

Session: Jun 2013 (session 2)
Wavelength: 1.3 cm

Comment


To give feedback on this experiment, click here

Experiment Feedback

Yebes (Rubén Fernández at Tue Jun 11 10:38:30 2013) Minor failures:
Fail the first six scans due to problems with the frecuency of observation

Hartebeesthoek (Jonathan Quick at Tue Jun 11 10:43:23 2013) Minor failures: FORM RECO
Bad scan_checks on No0005, 12, 15, 22 and 24 with red ERR led lit, possible clock jumps?

Urumqi (Peng Li at Tue Jun 11 10:45:23 2013) Minor failures: WIND
Heavy rain during the test

Torun (K. Borkowski at Wed Jun 12 05:57:54 2013) Success:
No known problems.

Metsahovi (E.Rastorgueva-Foi at Wed Jun 12 20:40:43 2013) Minor failures: FS
General issue with schedule for astro2 DBBC. Procedure was created from "digital" schedule with modified bbc assignment: bbc09-5...bbc12-8. After drudg, bbc numbering in .prc was edited manually to reflect the correct physical configuration: bbc05 -> bbc09...bbc08 -> bbc12, form=astro -> astro2. astro2 is not supported by dBBC DDCv102, thus, LCP (ifb) is lost.

Effelsberg (Georgi at Thu Jun 13 06:56:57 2013) Minor failures:
start 07:52 encoder jump

Onsala (Michael Lindqvist at Fri Jun 14 07:06:58 2013) Success:
No known problems.

Zelenchukskaya (Kiselev P. at Fri Jun 14 09:57:31 2013) Success: