Noto (L. Papaleo at Tue Jun 04 22:03:44 2013) Minor failures: POIN
lost some scan at 18:04 to 18:20 for antenna soft limit

Urumqi (Mingfei Gao at Wed Jun 05 02:29:00 2013) Success:

Urumqi (Mingfei Gao at Wed Jun 05 03:10:49 2013) Success:
At UT 00:00,the source reached limit position,so we stop observation.

Noto (g.nicotra at Wed Jun 05 05:10:26 2013) Success:

Medicina (A.Mattana at Wed Jun 05 05:30:55 2013) Success:
SUCCESS

Medicina (A.Mattana at Wed Jun 05 05:31:13 2013) Success:
SUCCESS

Medicina (A.Mattana at Wed Jun 05 05:31:23 2013) Success:
SUCCESS

Torun (K. Borkowski at Wed Jun 05 05:42:49 2013) Success:
No known problems.

Effelsberg (Georgi at Wed Jun 05 07:00:56 2013) Minor failures:
1 h late source too deep and outher problems

Svetloe (Stepanova I. at Wed Jun 05 11:32:13 2013) Minor failures: FS
Scans no0096-no0103, no0203-no0218, no0223-no0230 failed due to LAN problems.

Zelenchukskaya (Ptitcin A. at Wed Jun 05 11:33:12 2013) Success:
Scans no0031-no0086 missed due to participation in intensive geo session

Badary (Zhukov at Wed Jun 05 11:33:51 2013) Success:
From 18:41 to 20:45 break for observation intensive geo session.

Onsala (Michael Lindqvist at Wed Jun 05 12:52:25 2013) Failure:
Due to a power failure a unit we use before the DBBC got stuck at maximum attenuation. We most likely have had to low IF-level into the DBBC during the experiment.

Westerbork (Geert Kuper at Wed Jun 05 18:06:04 2013) Success:

Hartebeesthoek (Jonathan Quick at Fri Jun 07 06:53:55 2013) Minor failures: FORM RECO
Multiple clock errors in Mark5B, originating from VSI4 board in terminal, causing jumps in/total loss of scans 163, 167, 171, 187, 191, 201, 215 and from 231 to the end (~2hours in total). Additional jumps may have gone undetected.