EB039C

Session: Jun 2009 (session 1)
Wavelength: 5 cm

Comment


To give feedback on this experiment, click here

Experiment Feedback

Torun (Kaz Borkowski at Fri May 29 07:38:36 2009) Success :
No known problems.

Medicina (Zacchiroli at Fri May 29 07:40:16 2009) Success :

Yebes (JF Desmurs at Fri May 29 07:42:35 2009) Minor failures : SCHED
Some minor problems at the begining of the session due to formatter time error greater than 0.5 sec. For few scans, antenna arrived late on source, for scan num 327 at 04:35:20, the duration of the scan in the schedule was 0 second!

Effelsberg (Uwe Bach at Fri May 29 08:28:31 2009) Success :
Some source were not reached in time during the atmosphere calibration part at the beginning and at the end of the observations.

Onsala (Michael Lindqvist at Fri May 29 11:27:01 2009) Minor failures : RECO
Lost scans around 4:20-4:35 due to problems with a disk module.

Westerbork (Geert Kuper at Fri May 29 20:11:33 2009) Failure : ANT POIN
Wb used in phased array mode. We used TADUmax with only one RT. Due to a main powerfailure in Dwingeloo several computersystems went down. Our TMS system could not steer the telescopes and the backend. (No nameserver) the problem started at 22:31 UT May 28 and was solved at 06:41 UT May 29.

Noto (P. Cassaro at Mon Jun 8 09:49:42 2009) Success :
No known problems

Jodrell_Bank (Alastair Gunn at Tue Jun 23 13:41:42 2009) Success :
The MkII telescope was used (Jb2). No known problems.

Cambridge (Alastair Gunn at Tue Jun 23 13:42:08 2009) Success :
No known problems.