N06U1

Session: Jun 2006 (session 2)
Wavelength: 30 cm

Comment


To give feedback on this experiment, click

Experiment Feedback

Onsala (Michael Lindqvist at Thu Jun 1 19:04:56 2006) Failure : RFI
Severe RFI. Experiment failure.

Effelsberg (dgraham at Thu Jun 1 21:19:22 2006) Failure : RFI
Receiver severely overloaded by local TV channels at nearby frequencies. Some improvement after this experiment following insertion of extra IF filters and attenuation, preventing IF chain overload. So real experiments at this frequency should be better. But still not good.

Torun (K. Borkowski at Fri Jun 2 05:54:00 2006) Minor failures : RFI
Experiment carried out under same conditions as in F06U1: RFI, two circular polarization, no phase-cal.

Westerbork (tony foley at Fri Jun 2 11:35:34 2006) Minor failures : RFI
Wb used in phased array mode. RFI at low end of the band. We suspect German TV!

Noto (P. Cassaro at Fri Jun 16 19:31:42 2006) Failure :
Same as in F06U1.

EVN experiment feedback facility: entire session

Entire Session

Session: Jun 2006 (session 2)
Wavelengths: 30cm 18/21 5 6 cm

Comment


To give feedback on this entire session, click

Entire Session Feedback

Torun (Kaz Borkowski at Mon Jun 5 12:32:29 2006) Minor failures :
This note concerns the UHF experiments only. Shortly before the first experiment we could manage to install the Lange coupler to produce two circular polarizations instead of the linear polarization announced in the block schedule. Also, we failed to install the phase cal.

Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:14:12 2006) Success : PCAL
The MkII telescope was used (Jb2). During this session the Mk2 phase cal. signal was found to be too high and could not be easily reduced in strength. I therefore switched off the phas cal. signal for the entire session (for Mk2 only).