N06M2
Session: Jun 2006 (session 2)
Wavelength: 5 cm
Comment
To give feedback on this experiment, click
Experiment Feedback
Medicina (orfei at Fri Jun 9 22:02:17 2006) Success :
Onsala (Michael Lindqvist at Sat Jun 10 07:36:46 2006) Minor failures :
Could be a problem with VC03?
Westerbork (Tony Foley at Mon Jun 12 06:47:44 2006) Success :
Single dish was used. Please change the coordinates in the vexfile accordingly.
No known problems
Hartebeesthoek (Jonathan Quick at Mon Jun 12 07:10:46 2006) Success :
No known problems
Torun (K.Borkowski at Mon Jun 12 07:59:49 2006) Minor failures :
Essentially no problems, however 4 scans (about 10 min) after 20:54 recorded off source because this much time is required to switch an RF filter, as implied by the schedule. Such operation is done here in the upper telescope cabin manually and only by an entitled person.
Torun (Kaz at Mon Jun 12 08:11:17 2006) Minor failures :
Oops! In the first message I forgot to mention a failure of the receivers power supply which caused about half an hour loss of observations (since 21:44). The last four scans should be good.
Effelsberg (A. Polatidis at Mon Jun 12 08:45:51 2006) Success :
Noto (P. Cassaro at Sat Jun 17 12:00:12 2006) Success :
Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:15:09 2006) Success :
The MkII telescope was used (Jb2).
No known problems.
Cambridge (Alastair Gunn at Tue Jun 20 09:15:49 2006) Success :
The Darnhall telescope was used. No known problems.
EVN experiment feedback facility: entire session
Entire Session
Session: Jun 2006 (session 2)
Wavelengths: 30cm 18/21 5 6 cm
Comment
To give feedback on this entire session, click
Entire Session Feedback
Torun (Kaz Borkowski at Mon Jun 5 12:32:29 2006) Minor failures :
This note concerns the UHF experiments only.
Shortly before the first experiment we could manage to install the Lange coupler to produce two circular polarizations instead of the linear polarization announced in the block schedule. Also, we failed to install the phase cal.
Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:14:12 2006) Success : PCAL
The MkII telescope was used (Jb2).
During this session the Mk2 phase cal. signal was found to be too high and could not be easily reduced in strength. I therefore switched off the phas cal. signal for the entire session (for Mk2 only).