GV018B

Session: Jun 2006 (session 2)
Wavelength: 30 cm

Comment


To give feedback on this experiment, click

Experiment Feedback

Onsala (Michael Lindqvist at Sun Jun 4 12:52:13 2006) Failure : RFI
Severe RFI.

Torun (K. Borkowski at Mon Jun 5 06:36:35 2006) Minor failures : RFI
No known problems apart from strong RFI. (BBC sidebands set to upper for the entire experiment; see feedback for EV015).

Westerbork (Tony Foley at Mon Jun 5 09:13:51 2006) Minor failures : RFI
Wb used in phased array mode. Some very strong RFI about 08:30-08:45UT. Otherwise mostly clean

Effelsberg (dgraham at Thu Jun 8 11:17:06 2006) Minor failures : RFI
RFI at 07 and 10:45

Noto (P. Cassaro at Fri Jun 16 22:44:58 2006) Minor failures : RFI

EVN experiment feedback facility: entire session

Entire Session

Session: Jun 2006 (session 2)
Wavelengths: 30cm 18/21 5 6 cm

Comment


To give feedback on this entire session, click

Entire Session Feedback

Torun (Kaz Borkowski at Mon Jun 5 12:32:29 2006) Minor failures :
This note concerns the UHF experiments only. Shortly before the first experiment we could manage to install the Lange coupler to produce two circular polarizations instead of the linear polarization announced in the block schedule. Also, we failed to install the phase cal.

Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:14:12 2006) Success : PCAL
The MkII telescope was used (Jb2). During this session the Mk2 phase cal. signal was found to be too high and could not be easily reduced in strength. I therefore switched off the phas cal. signal for the entire session (for Mk2 only).