GB058
Session: Jun 2006 (session 2)
Wavelength: 6 cm
Comment
To give feedback on this experiment, click
Experiment Feedback
Noto (P. Cassaro at Sat Jun 17 12:36:45 2006) Success :
Torun (Kaz Borkowski at Mon Jun 19 06:28:13 2006) Minor failures : ANT
About one hour (after 2:02 UT) lost because a crash of computer controlling the atenna.
Westerbork (Tony Foley at Mon Jun 19 08:05:02 2006) Success :
Wb used in phased array mode.
No known problems
Effelsberg (A. Polatidis at Mon Jun 19 14:43:37 2006) Success :
Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:29:20 2006) Success :
The MkII telescope was used (Jb2).
No known problems.
Medicina (Andrea Orlati at Tue Jun 20 09:29:37 2006) Success :
Non known problems.
EVN experiment feedback facility: entire session
Entire Session
Session: Jun 2006 (session 2)
Wavelengths: 30cm 18/21 5 6 cm
Comment
To give feedback on this entire session, click
Entire Session Feedback
Torun (Kaz Borkowski at Mon Jun 5 12:32:29 2006) Minor failures :
This note concerns the UHF experiments only.
Shortly before the first experiment we could manage to install the Lange coupler to produce two circular polarizations instead of the linear polarization announced in the block schedule. Also, we failed to install the phase cal.
Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:14:12 2006) Success : PCAL
The MkII telescope was used (Jb2).
During this session the Mk2 phase cal. signal was found to be too high and could not be easily reduced in strength. I therefore switched off the phas cal. signal for the entire session (for Mk2 only).