F06C2
Session: Jun 2006 (session 2)
Wavelength: 6 cm
Comment
To give feedback on this experiment, click
Experiment Feedback
Urumqi (Zhang Hua at Tue Jun 13 14:07:04 2006) Success :
Hartebeesthoek (Jonathan Quick at Tue Jun 13 14:10:14 2006) Minor failures : WIND
High winds - no other known problems
Torun (K. Borkowski at Tue Jun 13 14:22:16 2006) Success :
No known problems.
Shanghai (Tao An at Tue Jun 13 14:45:55 2006) Success :
Medicina (Orlati Andrea at Tue Jun 13 14:46:21 2006) Success :
Onsala (Michael Lindqvist at Wed Jun 14 05:03:43 2006) Success :
No known problems.
Arecibo (CJS,EM,TG at Wed Jun 14 14:30:36 2006) Success :
Westerbork (Tony Foley at Thu Jun 15 07:43:54 2006) Success :
Wb used in phased array mode.
No known problems
Noto (P. Cassaro at Sat Jun 17 12:13:07 2006) Success :
Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:22:04 2006) Success :
The MkII telescope was used (Jb2).
No known problems.
Cambridge (Alastair Gunn at Tue Jun 20 09:22:28 2006) Success :
No known problems.
EVN experiment feedback facility: entire session
Entire Session
Session: Jun 2006 (session 2)
Wavelengths: 30cm 18/21 5 6 cm
Comment
To give feedback on this entire session, click
Entire Session Feedback
Torun (Kaz Borkowski at Mon Jun 5 12:32:29 2006) Minor failures :
This note concerns the UHF experiments only.
Shortly before the first experiment we could manage to install the Lange coupler to produce two circular polarizations instead of the linear polarization announced in the block schedule. Also, we failed to install the phase cal.
Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:14:12 2006) Success : PCAL
The MkII telescope was used (Jb2).
During this session the Mk2 phase cal. signal was found to be too high and could not be easily reduced in strength. I therefore switched off the phas cal. signal for the entire session (for Mk2 only).