EP056A

Session: Jun 2006 (session 2)
Wavelength: 6 cm

Comment


To give feedback on this experiment, click

Experiment Feedback

Urumqi (Zhang Hua at Wed Jun 14 02:28:45 2006) Success :

Onsala (Michael Lindqvist at Wed Jun 14 05:08:00 2006) Success :
No known problems.

Torun (K. Borkowski at Wed Jun 14 05:23:24 2006) Success :
No known problems.

Medicina (Morsiani at Wed Jun 14 07:04:36 2006) Success :

Effelsberg (A. Polatidis at Wed Jun 14 16:38:06 2006) Minor failures : RECO
Lost scans between 0310 and 0331 due to a problem with a diskpack. Otherwise OK.

Westerbork (Tony Foley at Thu Jun 15 07:47:27 2006) Minor failures : RECO
Wb used in phased array mode. scan check reported errors on ep056b_j2001+1027_no0067 (errors 81920) ep056a_j1941-0511_no0075 (28672)and ep056a_j1941-0511_no0091 (4). Others OK

Westerbork (Tony Foley at Thu Jun 15 07:48:46 2006) Minor failures : RECO
Wb used in phased array mode. scan check reported errors on ep056b_j2001+1027_no0067 (errors 81920) ep056a_j1941-0511_no0075 (28672)and ep056a_j1941-0511_no0091 (4). Others OK

Westerbork (Tony Foley at Thu Jun 15 09:12:26 2006) Minor failures :
Wb used in phased array mode. Also UART errors to formatter "0x1004" at 23:24,00:37 and 03:58 - I presume these are not a problem as the formatter mode stays the same.

Shanghai (An Tao at Fri Jun 16 16:38:40 2006) Success :

Noto (P. Cassaro at Sat Jun 17 12:15:43 2006) Success :

Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:23:44 2006) Success :
The MkII telescope was used (Jb2). No known problems.

Cambridge (Alastair Gunn at Tue Jun 20 09:24:14 2006) Success :
No known problems.

Shanghai (Tao An at Wed Jun 21 00:44:19 2006) Success :
Shanghai did not attend EP056a.

EVN experiment feedback facility: entire session

Entire Session

Session: Jun 2006 (session 2)
Wavelengths: 30cm 18/21 5 6 cm

Comment


To give feedback on this entire session, click

Entire Session Feedback

Torun (Kaz Borkowski at Mon Jun 5 12:32:29 2006) Minor failures :
This note concerns the UHF experiments only. Shortly before the first experiment we could manage to install the Lange coupler to produce two circular polarizations instead of the linear polarization announced in the block schedule. Also, we failed to install the phase cal.

Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:14:12 2006) Success : PCAL
The MkII telescope was used (Jb2). During this session the Mk2 phase cal. signal was found to be too high and could not be easily reduced in strength. I therefore switched off the phas cal. signal for the entire session (for Mk2 only).