CL06M2

Session: Jun 2006 (session 2)
Wavelength: 5 cm

Comment


To give feedback on this experiment, click

Experiment Feedback

Effelsberg (A. Polatidis at Mon Jun 12 11:32:49 2006) Success :
Done

Onsala (Michael Lindqvist at Wed Jun 14 05:02:58 2006) Success :
Done.

Medicina (Andrea Orlati at Thu Jun 15 08:22:32 2006) Success :
Done.

Noto (P. Cassaro at Sat Jun 17 11:53:43 2006) Success :

Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:12:13 2006) Success :
The MkII telescope was used (Jb2). Done

EVN experiment feedback facility: entire session

Entire Session

Session: Jun 2006 (session 2)
Wavelengths: 30cm 18/21 5 6 cm

Comment


To give feedback on this entire session, click

Entire Session Feedback

Torun (Kaz Borkowski at Mon Jun 5 12:32:29 2006) Minor failures :
This note concerns the UHF experiments only. Shortly before the first experiment we could manage to install the Lange coupler to produce two circular polarizations instead of the linear polarization announced in the block schedule. Also, we failed to install the phase cal.

Jodrell_Bank (Alastair Gunn at Tue Jun 20 09:14:12 2006) Success : PCAL
The MkII telescope was used (Jb2). During this session the Mk2 phase cal. signal was found to be too high and could not be easily reduced in strength. I therefore switched off the phas cal. signal for the entire session (for Mk2 only).