EP039B
Session: Feb 2002 (session 1)
Wavelength: 5.0 cm
Comment
To give feedback on this experiment, click
here
Experiment Feedback
Medicina (Carlo Migoni at Thu Feb 7 04:43:24 MET 2002) Success
Sometimes fog, rain and strong wind.
High TSys.
Mark IV ok, antenna ok.
Torun (K.Borkowski at Thu Feb 7 09:16:28 MET 2002) Success
No known problems other than the lack of automatic calibrations
of Tsys (these were carried out manually every 1 hour).
Effelsberg (A. Kraus at Thu Feb 7 10:27:44 MET 2002) Minor failures
We lost the data between UT0816-0846 (failure of the angular
encoders). Few scans were lost due to insufficient slewing time or
were skipped for pointing.
\(Other\) (John Conway at Fri Feb 8 08:25:23 MET 2002) Success
No known problems
Onsala (John Conway at Fri Feb 8 08:25:31 MET 2002) Success
No known problems
Onsala (John Conway at Fri Feb 8 08:26:42 MET 2002) Success
No known problems. Winds got high toward the end
of expt (10m/s)
Jodrell_Bank (Alastair Gunn at Mon Feb 11 11:27:49 MET 2002) Minor failures
Telescope parked at 05:30 UT (day 37) due to high winds.
Resumed observations at 13:40 UT (day 37). Scan on s252
at 02:00 UT (day 38) missed due to inadequate slew times.
No other known problems.
Cambridge (Alastair Gunn at Mon Feb 11 11:28:26 MET 2002) Success
No known problems.