C00C1
Session: Feb 2000 (session 1)
Wavelength: 6 cm
Comment
To give feedback on this experiment, click
here
Experiment Feedback
Onsala (A. Polatidis at Wed Mar 1 00:36:55 MET 2000) Minor failures
Stopped observing at 1711 UT. Telescope stopped due to limit switch failure. There were stong winds anyway so the antenna would be stowed for most of this time anyway.
Medicina (Mantovani at Wed Mar 1 00:41:18 MET 2000) Success
sky clear
Torun (K.Borkowski at Wed Mar 1 09:21:50 MET 2000) Minor failures
Observations started 45 min. late (two scans missed) because
the operator (me in this case) initially mounted a thick tape.
No other known problems.
Effelsberg (A. Kraus at Wed Mar 1 10:31:42 MET 2000) Minor failures
Observation was stopped between UT1245-1845 because of strong winds.
Westerbork (Tony Foley at Wed Mar 1 10:55:52 MET 2000) Success
First 4 scans of DA193 replaced by local calibration, as
DA193 was out of hour angle range.
No other known problems
Shanghai (Huang Xinyong at Wed Mar 1 12:16:28 MET 2000) Success
Jodrell (Alastair Gunn at Thu Mar 2 05:38:01 MET 2000) Minor failures
Clock data wrong for first 7 minutes of experiment. FS crashed
at 16:46 UT, restarted for reverse pass at 17:21 UT.
Cambridge (Alastair Gunn at Thu Mar 2 05:38:24 MET 2000) Minor failures
FS crashed at about 14:24 UT, not recovered properly until
14:38 UT. FS also restarted at about 16:19 UT. No other
known problems.
Noto (Noto VLBI friend at Thu Mar 2 12:11:00 MET 2000) Success
Calibration (Alastair Gunn at Wed Apr 19 13:10:27 METDST 2000) Success
Calibration data available from vlbeer: see file feb00/c00c1.antab for details